Geoterra was appointed by the Aspin Group and Story Contracting to carry out a 3D subsurface laser scan survey of buried culverts beneath the proposed rail line extension at Waverley Railway Station in Edinburgh.
The survey data was required by the... Read more
Geoterra was appointed by Wardell Armstrong to carry out a 3D subsurface laser scan survey of the Milwr Tunnel at a disused lead mine. A 3D laser scan survey of the surface was also required of the locale around the... Read more
Geoterra was appointed by M & J Drilling to carry out a 3D subsurface laser scan survey of a disused railway tunnel discovered beneath Victoria Park in Swinton, Greater Manchester.
The survey data was required by the client to assess the... Read more
Geoterra was appointed by Van Elle Ground Engineers to carry out a 3D subsurface laser scan survey of a historic limestone mine discovered beneath a construction site earmarked for new homes in Straiton, Edinburgh.
The survey data was required to assess... Read more
Geoterra was appointed by the Canal & River Trust to carry out a 3D topographical laser subsurface scan survey of a sinkhole collapse above a culvert adjacent to Taylor’s Boatyard drydock and the Shropshire Union Canal in Chester.
The survey data... Read more
Geoterra was appointed by Taziker Industrial to carry out a 3D topographical laser subsurface scan survey of a drainage culvert running beneath the railway embankment in Stowmarket, Suffolk.
The survey data was required to assess the location and alignment of the... Read more
Phone: +44 (0)1606 659019Email: info@geoterra.co.uk