We were appointed by the Mining Remediation Authority (MRA) to survey a historic mine shaft at the former Creswell Colliery.
After the colliery closed in 1991, the shaft had been mothballed and slowly filled with water once the... Read more
We were appointed by INEOS Inovyn to survey a brine cavity (H222) of approximately 1.2 million cubic metres located beneath a 1,600-hectare brinefield, as part of their brine cavity logging programme.
Northwich is a historic salt town where brine mining and processing continue today by INEOS to... Read more
We were requested by the Mining Remediation Authority (MRA) to survey a legacy mine shaft and connecting drainage adit following a significant ‘blowout’ event in a residential area.
The drainage adit, originally built to channel water away from the mine... Read more
The Canal & River Trust appointed Geoterra to carry out a combined 3D mobile mapping laser scan and bathymetric multibeam sonar survey of the Islington Tunnel on Regent’s Canal.
The tunnel runs beneath Islington, stretching 878 meters from Caledonian Road to... Read more
Geoterra was contracted by The Coal Authority to survey a partially submerged coal mine shaft in the UK. The survey aimed to assess the structural integrity of the shaft, which had partially collapsed and was filling with water after mine... Read more
A new railway station was due to be constructed in Willenhall, Staffordshire on the Wolverhampton to Walsall mainline.
Historic mine plans indicated that a coal mine roadway was situated directly beneath where the proposed new railway station was to be built.... Read more
Phone: +44 (0)1606 659019Fax: Not AvailableEmail: info@geoterra.co.uk