Following a major ground collapse on Kilbowie Road in Clydebank, Geoterra were appointed by Soil Engineering and The Coal Authority to carry out an urgent mine shaft survey.
Kilbowie Road is a major artery road into Glasgow city. The... Read more
Geoterra was appointed by Story Rail (Story Contracting) to carry out a full 3D laser scan survey of the cutting at Loups Fell, Shap, Cumbria on the Network Rail West Coast Mainline. The survey data was required for Manchester-based... Read more
Geoterra was appointed by Cheshire Gymnastics to carry out a full 3D digital laser scan survey of the former Moss Farm Swimming and Leisure Complex in Northwich, Cheshire. The survey data was required for Manchester-based architects, AEW to produce a... Read more
Jacob Geomatics appointed Geoterra to carry out a 3D laser scan as-built survey of the internal spillway outlet at Jumbles Reservoir in Greater Manchester.
The survey data was required by Jacobs Geomatics to enable them to assess the re-design of the... Read more
Phone: +44 (0)1606 659019Fax: Email: [email protected]