Stanton-on-the-Wolds Golf Club required a full topographical survey for a redesign of the 18-hole parkland golf course. The project includes future planned extensions to the golf course and new holes.
Severn Partnership commissioned Geoterra to carry out a UAV aerial survey... Read more
Jacob Geomatics appointed Geoterra to carry out a 3D laser scan as-built survey of the internal spillway outlet at Jumbles Reservoir in Greater Manchester.
The survey data was required by Jacobs Geomatics to enable them to assess the re-design of the... Read more
The £100 million Shieldhall Tunnel in Glasgow is designed to alleviate pressure on the existing waste water network. It achieves this by providing additional storm water storage, reduces the risk of flooding and improving the water quality in the River... Read more
Geoterra was appointed by a firm of building contractors to carry out a topographical survey, subsurface laser scan survey and multibeam sonar survey to identify the location and structure of a culvert at Chester Road in the City of Manchester,... Read more
Phone: +44 (0)1606 659019Fax: Email: info@geoterra.co.uk