Projects

Shieldhall Strategic Tunnel

The £100 million Shieldhall Tunnel in Glasgow is designed to alleviate pressure on the existing waste water network. It achieves this by providing additional storm water storage, reduces the risk of flooding and improving the water quality in the River... Read more

Stanton-on-the-Wolds Golf Club

Stanton-on-the-Wolds Golf Club required a full topographical survey for a redesign of the 18-hole parkland golf course. The project includes future planned extensions to the golf course and new holes.

Severn Partnership commissioned Geoterra to carry out a UAV aerial survey... Read more

Warmwell Quarry

Geoterra was appointed by consultant engineers Peter Brett Associates, on behalf of developers Habitat First Group, to carry out a full UAV aerial mapping survey of Warmwell Quarry and Silverlakes. This survey data was required in preparation for the property... Read more

West Coast Mainline

Geoterra was appointed by Story Rail (Story Contracting) to carry out a full 3D laser scan survey of the cutting at Loups Fell, Shap, Cumbria on the Network Rail West Coast Mainline. The survey data was required for Manchester-based... Read more

subsurface laser scan survey

Whitley Bay Old Mining Void

Dunelm Geotechnical & Environmental and Kier appointed Geoterra to carry out an as-built 3D subsurface laser scan survey of a void discovered beneath the promenade at Whitley Bay in North Shields, Northumberland

The survey data was required by Kier to enable... Read more