Geoterra was appointed by Story Rail (Story Contracting) to carry out a full 3D laser scan survey of the cutting at Loups Fell, Shap, Cumbria on the Network Rail West Coast Mainline. The survey data was required for Manchester-based... Read more
Geoterra was appointed by Wardell Armstrong to carry out a subsurface laser scan survey of Caeau Shaft at Milwr Tunnel in North Wales.
Consulting engineers Wardell Armstrong required three-dimensional geospatial data to determine the exact shape and dimensions of the upper... Read more
Stanton-on-the-Wolds Golf Club required a full topographical survey for a redesign of the 18-hole parkland golf course. The project includes future planned extensions to the golf course and new holes.
Severn Partnership commissioned Geoterra to carry out a UAV aerial survey... Read more
Geoterra was appointed by Cheshire Gymnastics to carry out a full 3D digital laser scan survey of the former Moss Farm Swimming and Leisure Complex in Northwich, Cheshire. The survey data was required for Manchester-based architects, AEW to produce a... Read more
Jacob Geomatics appointed Geoterra to carry out a 3D laser scan as-built survey of the internal spillway outlet at Jumbles Reservoir in Greater Manchester.
The survey data was required by Jacobs Geomatics to enable them to assess the re-design of the... Read more
The £100 million Shieldhall Tunnel in Glasgow is designed to alleviate pressure on the existing waste water network. It achieves this by providing additional storm water storage, reduces the risk of flooding and improving the water quality in the River... Read more
Phone: +44 (0)1606 659019Fax: Email: info@geoterra.co.uk