Underground Surveying - Projects

Dunford Bridge Drainage Culvert Survey

Geoterra was appointed by WSP Consultant Engineers to carry out a 3D topographical survey of a confined space drainage culvert that runs directly underneath the Trans Pennine Way at Dunford Bridge in South Yorkshire.

The survey data was required to assess... Read more

Subsurface Multibeam Sonar Survey

Port Immingham Submerged Void Survey

Geoterra was appointed by ABP and DFDS to carry out a subsurface multibeam sonar scan survey of a submerged void discovered beneath Berth 11 at Port of Immingham in Lincolnshire. A 3D CAD plan drawing had already been created so... Read more

Subsurface Laser Scan Survey of Drainage Culverts

Geoterra was appointed by the Environment Agency to carry out a 3D topographical laser subsurface scan survey of a series of drainage culverts running beneath both property and transport links in Skipton, North Yorkshire.

The survey data was required to assess... Read more